檢查井模具整體是由三部分組成的:預留孔,調節圈,收口。水泥檢查井模具是其中的一種叫法,也有的地方稱觀察井模具、滲水井模具、窖井模具、水泥井模具、下水井模具、閥門井模具、消防井模具、排水井模具等等,總之根據它的不同作用有好多叫法,但是制作過程其實都差不多。預留孔是用來連接地下容易發生故障而定期需要檢修與維護的地方,如地下管道接頭,彎頭處,電纜等等。中間部分是調節圈,調節圈顧名思義就是用來調節整個井體在地下的高度,能夠適應各種安裝深度要求,有效降低了安裝成本。整個井體的最上面就是收口部分,收口是與地面相齊平最后加上與收口直徑相同的井蓋,這樣整個埋在地下的檢查井就和地面保持齊平了。
Inspection well mold is composed of three parts: reserved hole, adjusting ring and closing. Cement inspection well mold is one of the methods. In some places, it is also called observation well mold, seepage well mold, cellar well mold, cement well mold, down well mold, valve well mold, fire well mold, drainage well mold, etc. in short, according to its different functions, there are many ways to call it, but the production process is actually similar. Reserved holes are used to connect underground places that are prone to failure and need regular maintenance, such as underground pipe joints, elbows, cables, etc. The middle part is the regulating ring, which, as the name implies, is used to adjust the height of the whole well in the underground, which can meet the requirements of various installation depths and effectively reduce the installation cost. The top part of the whole well body is the closing part, which is flush with the ground. Finally, a manhole cover with the same diameter as the closing in diameter is added, so that the whole buried inspection well is flush with the ground.
檢查井模具使用過程中,需要注意施工人員在拼接模具時盡量使用電動扳手,因為拼接和拆除時一般只需要把模具連接處的螺栓擰緊和拆卸下來就可以了,特別的便捷,組裝模具時需要保證每個螺栓擰的緊實模具之間不留縫隙,使用電動扳手擰緊,既能保證螺栓擰的夠緊實,施工人員比起一個一個手動操作省時省力。2.在注入混凝土之前,需要在模具內均勻地涂抹工業機油,雖然模具的表面光滑,但是在注入剛攪拌好的混凝土之后不刷油的話,等混凝土凝固之后很容易與模具產生粘連的現象,刷洗的時候不但工作人員費時費力,而且還會減少模具的使用壽命。3.為了保證使用方形檢查井模具制作生產出來的方形檢查井使用時間長久,在注入混凝土時需要使用振動棒把混凝土內產生的氣泡全部震動出來,使用完方形檢查井模具之后,一定要及時的對模具進行清洗
In the process of using the inspection well mold, it is necessary to pay attention to the use of electric wrench by the construction personnel when splicing the mold. Generally, only the bolts at the joint of the mold need to be tightened and disassembled, which is especially convenient. When assembling the mold, it is necessary to ensure that each bolt is tightened tightly, and there is no gap between the molds. The use of electric wrench can ensure the bolt tightening Compared with a manual operation, the construction personnel can save time and labor. 2. Before pouring concrete, it is necessary to evenly apply industrial oil into the mold. Although the surface of the mold is smooth, it is easy to adhere to the mold after the concrete is solidified without oil painting. When brushing, it is not only time-consuming and laborious for the staff, but also can reduce the service life of the mold. 3. In order to ensure that the square inspection well produced by using the square inspection well mold has a long service life, it is necessary to use a vibrator to vibrate all the bubbles generated in the concrete when pouring concrete. After using the square inspection well mold, the mold must be cleaned in time.