排水井模具之所以使用鋼模板,是因為鋼模板有著很大的優勢,排水井模具在焊接的時候,也能承受相對的應力,經受高速運轉的振動平臺也能保持不變形,我們在這個過程當中也要時時檢查其使用效果。排水井模具使用了質量好的混凝土做預制產品,所以混凝土在使用的時候,也要注意一些情況,首先,混凝土不能放在高溫的環境中,高溫的條件會讓混凝土喪失其原有的硬度和剛度,難以再次使用,施工之前要經過嚴謹的檢查,在完工以后也要對混凝土制品進行澆水養護,讓其更加堅固;其次,一些受潮的混凝土是不能投放到生產當中的,因為它的水分已經太多,會造成結硬結塊的現象,失去使用效果,這些混凝土要經過篩選后再投放;再次,我們使用之前要經過攪拌攪實,不能在比較寒冷的條件下存放,否則會讓里面的水分膨脹,混凝土質量遭到嚴重破壞。
The reason why steel formwork is used in drainage well mould is that steel formwork has great advantages. When welding, it can also bear relative stress, and the vibration platform can maintain no deformation under high-speed operation. In this process, we should always check its use effect. Inspection well steel mold uses good quality concrete as prefabricated products, so when using concrete, we should pay attention to some conditions. First of all, the concrete can not be placed in high temperature environment. High temperature conditions will make the concrete lose its original hardness and stiffness, which is difficult to use again. Before construction, we should go through strict inspection, and after the completion of the concrete products, we should also pay attention to some conditions Second, some wet concrete can not be put into the production because it has too much moisture, which will cause the phenomenon of caking and losing the use effect. These concrete should be put after screening. Thirdly, we should mix and mix before using, and can not be stored in cold conditions, otherwise it will give way The concrete quality is seriously damaged due to the water expansion on the surface.
排水井模具是要按照規定的流程進行操作,只有這樣才能制作出合格的井筒預制件,當然在進行生產的時候也要注意好對于模具的一些保護,但是更主要的還是必須按照規定的方式進行模具的使用。
Drainage well mold is to operate in accordance with the specified process, only in this way can we produce qualified shaft prefabricated parts. Of course, we should pay attention to some protection for the mold during production, but more importantly, we must use the mold according to the specified way.
排水井模具使用過程:
1.需要使用螺栓進行模具的組裝,螺栓的型號與規格是需要與將配套的,不能夠胡亂使用組裝的零件,并且拼裝模具的時候,需要使用電動扳手將多塊模具組裝在一起,這樣可以讓螺栓將模具牢牢的固定,普通的螺栓工人在操作的時候比較的麻煩。2.每次生產之前井筒模具內是需要進行刷油的,刷油是指將油性的材料在模具的內里進行涂刷,避免泥漿直接的在模具的表面進行凝固。3.澆筑上泥漿后需要將振動棒插入到井筒模具中,對泥漿進行震動的處理,將氣泡排出干凈后就可以繼續來進行晾曬了。
Using process of drainage well mould:
1. It is necessary to use bolts to assemble the mold. The model and specification of the bolts need to be matched with the parts to be assembled. When assembling the mold, it is necessary to use an electric wrench to assemble multiple molds together, so that the bolts can firmly fix the mold. Ordinary bolt workers are more troublesome in operation. 2. Before each production, it is necessary to brush oil in the wellbore mold. Oil painting refers to painting oily materials in the mold to avoid the mud directly solidifying on the surface of the mold. 3. After pouring the mud, it is necessary to insert the vibrator into the shaft mould to vibrate the mud. After the bubbles are discharged, it can be continued to dry.